产品展示

产品展示

current position: Home > Product Center > Customer Case

hot key wordsKeywords

contact usContact Us

Zhejiang Shangneng Boiler Co., Ltd

Sales hotline:0575-82190417

Fax number: 0575-82190419

Company email: public@zjshangneng.com

After-sales hotline:0575-82190418

After-sales mailbox:after-sale@zjshangneng.com

Website:www.zjshangneng.com

Add: No.77,Development Road, Zhangzhen, Shangyu District, Shaoxing City, Zhejiang Province


  • product details
  • Product performance
  • Product advantages
  • Selection Download

When selecting the working principle of the high-pressure electrode boiler, the following parameters are usually required, depending on the customer:

◆ Guest rooms.

1, air conditioning heating: hotel building area (or design heat load), refrigeration equipment configuration;

2. Sanitary hot water: number of hotel rooms, water consumption of kitchen, sauna, swimming pool, etc.

3. The height of the main building used, the zoning of sanitary hot water, and the supply of cold water (frequency change, constant pressure, etc.);

4. Location, area, height and interface of boiler room;

5. Fuel used: natural gas, diesel, electricity, or need to use diesel before switching to natural gas heating unit:

(1) Air conditioning heating: required building area (or design heat load);

Second, the end of the air conditioning: the high-temperature electrode boiler uses heat dissipation plate or floor heating, such as zoning, but also need to provide the heating area of each region;

3. The height of the main building used;

4. Location, area, height and interface of boiler room;


Tags

Previous: High voltage electrode boiler2023-06-27

Recently Viewed:

Related products

Related news

  • menu
Copyright © Zhejiang Shangneng Boiler Co., Ltd All rights reserved record number:浙ICP备17053598号-1
Technical Support: Huaqi Disclaimers

浙公网安备 33060402000896号